INTERNORGA 2027 Dates — Mar 12-16 Hamburg Messe | Food Service Stand Builder

INTERNORGA 2027 Dates — Mar 12-16 Hamburg Messe | Food Service Stand Builder

Published

Planning a stand at INTERNORGA? We design, build, and install custom exhibition stands worldwide. Free 3D concept in 24 hours.

INTERNORGA 2027 runs 12-16 March at Hamburg Messe und Congress, organised by Hamburg Messe und Congress GmbH. It is the leading European trade fair for the hospitality and food service industry, and like ISH it has a technical order that has to be placed long before anyone thinks about the stand.

Live cooking is an infrastructure decision

If you make commercial kitchen equipment, you will want to run it. Running it at INTERNORGA means extraction, and extraction means a hood, a duct route, a grease trap, and fire clearances around the appliance. Depending on what you are demonstrating you may also need a gas connection, a three-phase supply heavier than a normal stand, and a water and drainage point for washing down.

All of that is ordered from the venue's technical services on their own deadline. It also constrains where the demo can sit — usually against a hall wall or a services duct, not in the middle of your floor where you imagined it. Design the stand around the extraction point, not the other way round.

Plan for the smell and the queue

Two things surprise first-time exhibitors. First, cooking smells travel and your neighbours will notice; a demo that fills the aisle with fried food will win attention and lose goodwill. Second, a live demo creates a queue, and a queue blocks the stand for the buyers who came to talk business. Give the demo its own frontage and keep the meeting area behind or beside it, not through it.

Why Turkish manufacturers are here

Turkey is a substantial exporter of commercial kitchen equipment — ovens, ranges, refrigeration, stainless steel fabrication — and Germany is one of the largest markets for it. INTERNORGA runs annually and draws hotel groups, restaurant chains, bakeries, catering operators and dealer networks across five days, including a weekend so owner-operators can attend.

Our honest position on this fair

If you are not running a live demonstration, do not build for one. A stand designed around an extraction point you never use wastes both budget and the best position on your floor. And if this is your first INTERNORGA, consider demonstrating one hero appliance properly rather than three badly — the technical order for three is more than three times the trouble.

Design comes from Istanbul, the build happens in Germany, and one project manager handles the venue paperwork with you.

Exhibition Stand Cost Calculator

Estimate
36
6 m²50 m²100 m²200 m²

Estimated Budget Range

6,480 11,520

Reusability: 8-10 fuarInstall: 1-2 gün

Includes design + production + install + strike. Freight, furniture rental, AV equipment are extra line items. Real quote moves ±20% based on venue, show date, and revision rounds.

Get a 3D concept proposal

Three fields, two business day response.

Running a quick security check… if this does not clear, refresh the page or email info@evrekastand.com.

Recent References

Built for brands you may already know.

Porland — Ambiente Frankfurt 2024 · 365 m²

Porland

Ambiente Frankfurt 2024 · 365 m²

Pioli — EquipHotel Paris

Pioli

EquipHotel Paris

Youth House — COP29 Baku · 1200 m²

Youth House

COP29 Baku · 1200 m²

Baykar — Marrakech Air Show · 250 m²

Baykar

Marrakech Air Show · 250 m²

Design: Istanbul Studio · Manufacture: Kağıthane HQ · Single senior project manager

Since 2014 · Operating in 31 countries · 5 global offices

Planning an exhibition stand?
Let's build it together.

Tell us about your project and we'll prepare a tailored proposal within 48 hours.