ADEX 2026 Baku — Defence Exhibition Stand Solutions
The 6th Azerbaijan International Defence Exhibition (ADEX 2026) will be held from September 30 – October 2, 2026, at the Baku Expo Center. ADEX is the Caucasus region's premier defence and security trade exhibition.
About ADEX 2026
ADEX has established itself as a key platform for the defence industries of Azerbaijan, Turkey, Israel, Pakistan, and other allied nations. The exhibition features a comprehensive range of defence products and services.
Evreka Stand in Azerbaijan
Evreka Stand has proven experience delivering exhibition stands in Azerbaijan, including major projects at COP29 Baku. Our local knowledge and logistics capabilities in the region provide significant advantages:
- •Direct experience with Baku Expo Center
- •Established logistics network in the Caucasus region
- •Understanding of local regulations and customs processes
- •Bilingual project management (Turkish/English)
Contact Evreka Stand to discuss your ADEX 2026 exhibition stand requirements.
Show Hours — Day One Is a Half Day
A scheduling detail that catches exhibitors out: ADEX 2026 does not open for a full first day.
- •Wednesday 30 September — 14:00 to 18:00 (four hours only)
- •Thursday 1 October — 10:00 to 18:00
- •Friday 2 October — closing day
Plan around it. Your stand must be complete and staffed by early afternoon on the 30th, not by 10:00, but the compressed opening window also means the first-day delegation traffic is concentrated into four hours rather than spread across eight. Brief your team to be at full strength from the moment doors open — there is no quiet morning to warm up in.
What a Defence Exhibition Stand Actually Requires
Defence shows are not ordinary trade fairs, and stands that ignore the differences underperform badly:
- •Closed briefing rooms, not open meeting tables. Delegation conversations at a defence exhibition are frequently confidential. A stand without an enclosed, door-closing briefing space cannot host the meetings that justify attending.
- •Controlled sightlines. What is visible from the aisle should be a deliberate decision. Product displays, screens and documentation each need a considered position relative to public view.
- •Delegation reception sequence. Military and ministerial delegations arrive as groups, often on a fixed schedule with an escort. The stand needs a greeting point, a presentation position and seating for the group — in that order, physically.
- •Secure storage. Documentation, samples and equipment need a lockable area that is genuinely lockable, not a curtain.
- •Power and data resilience. Live demonstration systems failing during a scheduled delegation slot is not recoverable. Specify redundancy.
- •Documentation and clearance lead times. Any controlled or dual-use item on the stand carries export and import documentation requirements that take far longer than stand production. This is the deadline that actually governs your project.
Our Baku Track Record
Evreka Stand delivered five pavilions at COP29 Baku, including the Youth House Türkiye Pavilion at 1,200 m². That is directly transferable experience for ADEX: the same venue city, the same delegation-hosting format, the same customs and logistics chain into Azerbaijan, and the same requirement to build at pavilion scale to a fixed, immovable opening date.
Practically, it means we have already solved the Baku-specific problems — customs documentation, local crew coordination, material sourcing when something is missing on site, and the difference between what a drawing says and what the venue actually allows.
Planning Timeline
Planning windows from our project practice for a stand opening 30 September 2026. Confirm official deadlines in your exhibitor manual.
- •April-May 2026 — Space allocation confirmed. Design cannot be finalised before the stand's open sides are known.
- •June 2026 — Concept design and 3D sign-off. Briefing room position and delegation flow decided here, not later.
- •July 2026 — Technical drawings, structural calculations, venue submission. Export documentation started for any controlled items.
- •August 2026 — Production. Long-lead items first.
- •Early-mid September 2026 — Freight to Baku with a customs buffer. Do not compress this.
- •Late September 2026 — On-site build, systems test, delegation-flow rehearsal.
- •30 September 2026, 14:00 — Doors open.
Frequently Asked Questions
When and where is ADEX 2026? 30 September – 2 October 2026 at the Baku Expo Center, Baku, Azerbaijan. It is the 6th Azerbaijan International Defence Exhibition.
What are the opening hours? 30 September 14:00-18:00, 1 October 10:00-18:00, and a closing day on 2 October. Note that day one is a four-hour half day.
Who organises ADEX? The Ministry of Defence Industry of Azerbaijan, with Caspian Event Organisers.
Have you built in Baku before? Yes — five pavilions at COP29 Baku, including the Youth House Türkiye Pavilion at 1,200 m².
What is the single most common ADEX planning mistake? Treating export and import documentation for controlled items as a shipping formality. It has a longer lead time than building the stand, and it is the constraint that decides whether your equipment is on the stand on opening day.
Exhibition Stand Cost Calculator
EstimateEstimated Budget Range
€6,480 — €11,520
Includes design + production + install + strike. Freight, furniture rental, AV equipment are extra line items. Real quote moves ±20% based on venue, show date, and revision rounds.
Related Articles
Built for brands you may already know.

Porland
Ambiente Frankfurt 2025 · 365 m²

Pioli
EquipHotel Paris

Youth House
COP29 Baku · 1200 m²

Baykar
Marrakech Air Show · 250 m²
Design: Istanbul Studio · Manufacture: Kağıthane HQ · Single senior project manager
Since 2014 · Operating in 31 countries · 5 global offices
Planning an exhibition stand?
Let's build it together.
Tell us about your project and we'll prepare a tailored proposal within 48 hours.