EDGE stand at Teknofest Adana, built by Evreka Stand

Photo: Built by Evreka Stand: EDGE at Teknofest Adana

embedded world 2027 Dates — Mar 16-18 NurnbergMesse | Electronics Stand Builder

Published

Planning a stand at embedded world? We design, build, and install custom exhibition stands worldwide. Free 3D concept in 24 hours.

Quote window · embedded world 2027

Send hall, stand number and m². Price band and a feasibility answer within 2 business days.

Opens 16 March 2027 · NurnbergMesse, Nuremberg

  • Custom build (design sign-off)latest open
  • Modular / system stand (brief)latest open

At embedded world the stand is an electrical and thermal brief: demo racks, power density, a network connection ordered separately from NürnbergMesse, and cable routes that visitors will judge as part of your engineering. Road freight Istanbul to Nuremberg is 5–7 days. Technology stands we have built: STM at UDT 2026 in Bremen, METU Technopark at SAHA Expo 2026, Mobven at Perakende Günleri 2026. Send hall, m² and the number of live demo stations; we return a price band and a power-plan outline.

Built by Evreka: STM, UDT 2026 — Undersea Defence Technology · METU Technopark, SAHA Expo 2026 · Mobven, Perakende Günleri 2026

Dates derived from the opening day with our production and freight times; status as of 15 November 2026.

Send floor plan on WhatsApp

Price band for embedded world 2027

Hall, stand number and m². Floor plan by WhatsApp or e-mail if you have one. Reply within 2 business days.

Running a quick security check… if this does not clear, refresh the page or email info@evrekastand.com.

Exhibitor facts · embedded world 2027

Build-up, rules and deadlines from the organiser

Dates
16–18 March 2027, Nuremberg source
Set-up
Friday 12 to Sunday 14 March 2027 07:00–24:00, Monday 15 March 07:00–20:00; stands not started by 15:00 on 15 March are built by the organiser at the exhibitor's cost; advanced set-up only from 50 m² at EUR 480 per day source
Dismantling
18 March 17:00–24:00, 19 March 07:00–24:00, 20 March 07:00–19:00; early dismantling penalty 20% of net stand rental, minimum EUR 2,000 source
Height rule
Minimum 2.50 m, maximum 5.80 m measured from the hall floor; two-storey construction not permitted; Booth+Check six weeks before the event source
Deadlines
Regular booking ends 15 January 2027, last-minute booking after; application deadline 12 February 2027 source
Space price
Until 15 January 2027: in-line EUR 383 per m², corner 442, peninsula 462, island 481; from 16 January 397, 458, 478, 498; minimum 9 m²; plus AUMA EUR 0.60 per m², waste disposal EUR 6.40 per m² and marketing services EUR 1,290 source
Stand formats
Complete rental stand, individual stand or own construction; start-up package 5 m² at EUR 2,890 plus VAT source

5.80 m is generous for a single-storey hall, so height is rarely the constraint here; the 15 January booking step and the Booth+Check six weeks out are. The custom deadline on this page, production plus road freight, lands before both.

Source: organiser: embedded-world.de · checked 30 October 2026 · Organiser pages, Special Conditions as per January 2026 and exhibitor brochure; prices subject to VAT

embedded world 2027 runs 16-18 March at NurnbergMesse, organised by NurnbergMesse GmbH. It is the world's leading event for embedded systems, and it has a stand problem that almost no other fair has: everything on your stand is switched on at the same time.

Power density, then heat

A typical exhibition stand draws a few kilowatts for lighting and a coffee machine. An embedded world stand runs dozens of development boards, several screens, demo rigs, and often a rack — on a footprint that might be 20 square metres. The power order is routinely two or three times what a first-time exhibitor estimates, and it is ordered from the venue with a deadline.

Heat follows power. Enclosed demo pods and glazed cabinets that look excellent in a render become uncomfortable by mid-afternoon on day one, and warm boards behave differently from cool ones in front of a customer. Plan ventilation into any enclosed element, keep power supplies out of sealed voids, and give the rack its own airflow path.

The network is a separate order

Many demos need connectivity, and hall WiFi at embedded world is saturated by definition — every visitor and every stand is running something. If your demonstration depends on a live connection, order a wired line. Discovering on the morning of day one that your cloud demo cannot reach the cloud is a bad way to start three days.

Cable management is the visible part of your engineering

This audience reads a stand the way it reads a board layout. Visible cable chaos on a stand selling embedded reliability undercuts the pitch more effectively than any competitor could. Design cable routes into the furniture from the start: channels in the demo tables, entry points where boards actually sit, and enough slack for a live swap without dismantling anything.

Why Turkish exhibitors are here

Turkey's electronics, defence electronics and IoT sectors have grown into export markets where German and wider European design wins matter. embedded world runs annually in Nuremberg and is where component vendors, tool makers and module suppliers meet the engineers who specify them.

Our honest position on this fair

If you are a component or tool vendor with a small footprint, a well-executed modular stand with excellent demo tables and clean cabling beats a custom build with poor power planning every time. Spend on the electrical design and the demo furniture. And if your demo does not need to be enclosed, do not enclose it — open demos run cooler and draw more engineers.

We design in Istanbul and build in Germany, so your boards fly and your structure does not.

Exhibition Stand Cost Calculator

Estimate
36 m²
6 m²50 m²100 m²200 m²

Estimated Budget Range

€6,480 — €11,520

Reusability: 8-10 fuarInstall: 1-2 gün

Includes design + production + install + strike. Freight, furniture rental, AV equipment are extra line items. Real quote moves ±20% based on venue, show date, and revision rounds.

Get a 3D concept proposal

Three fields, two business day response.

Running a quick security check… if this does not clear, refresh the page or email info@evrekastand.com.

Recent References

Built for brands you may already know.

Porland — Ambiente Frankfurt 2024 · 365 m²

Porland

Ambiente Frankfurt 2024 · 365 m²

Pioli — EquipHotel Paris

Pioli

EquipHotel Paris

Youth House — COP29 Baku · 1200 m²

Youth House

COP29 Baku · 1200 m²

Baykar — Marrakech Air Show · 250 m²

Baykar

Marrakech Air Show · 250 m²

Design: Istanbul Studio · Manufacture: Kağıthane HQ · Single senior project manager

Since 2014 · Operating in 31 countries · 5 global offices

Planning an exhibition stand?
Let's build it together.

Tell us about your project and we'll prepare a tailored proposal within 48 hours.